sidewalk dug up next with installed granite curb inside with a red truck parked nearby

Framing of the exterior walls and completion of the brickwork remain 98% complete, with the openings on the west elevation in the north corner of the Bruce St. construction loading zone to be completed. Curbs were installed along Trinity and Bruce Streets, as well as Erving Avenue. The base preparation for the sidewalk has been completed. Most of the sidewalk concrete paving on Bruce Street has been placed.

 

Leahy June 2025 Update Progress Report

 